How to Handle Delivery and Storage of Select Fill in Dallas-Fort Worth Projects
Introduction
Proper delivery and storage of Select Fill can make or break a construction project in Dallas-Fort Worth (DFW). Even if you source high-quality Select Fill from a trusted Borrow Pit, improper handling can lead to wasted material, poor compaction, and increased costs.
This guide will cover:
- How to coordinate efficient deliveries from Borrow Pit suppliers.
- Best practices for unloading and storing Select Fill.
- How to prevent contamination, moisture issues, and material loss.
1. Coordinating Efficient Select Fill Deliveries in DFW
A. Choosing the Right Delivery Schedule
- Order Select Fill based on your construction timeline to avoid delays or excessive stockpiling.
- Consider weather conditions—heavy rain can cause moisture issues in stored material.
- Work with local Borrow Pits to schedule deliveries during non-peak hours for faster service.
B. Understanding Truckload Capacities
- Select Fill is typically delivered in dump trucks, belly dumps, or semi-end dumps.
- Common load capacities for Select Fill in DFW:
- Single-axle dump truck: 5–7 cubic yards
- Tandem-axle dump truck: 12–16 cubic yards
- Semi-end dump trailer: 20–25 cubic yards
- Ordering full truckloads minimizes costs per cubic yard.
C. Site Preparation for Delivery
- Ensure clear access roads for delivery trucks to prevent delays.
- Mark the dump site to direct drivers and avoid material being unloaded in the wrong location.
- Use grading equipment to spread material evenly as it is delivered.
2. Best Practices for Unloading Select Fill
A. Checking Material Quality Before Unloading
- Inspect moisture levels, particle size, and contamination before accepting a load.
- Reject loads with excessive organic material, debris, or oversized rocks that could impact compaction.
- Use a field moisture test—Select Fill should form a firm ball when squeezed but break apart under pressure.
B. Unloading Methods for Even Distribution
- Dump-and-spread technique: Trucks dump material as they drive forward to create an even layer.
- Layered unloading: Unloading Select Fill in thin layers (6-12 inches) improves compaction.
- Avoid stockpiling too high—piles over 8 feet can lead to excessive moisture retention.
3. Proper Storage Techniques for Select Fill
A. Choosing the Right Storage Location
- Store Select Fill on level, well-drained ground to prevent water pooling.
- Keep material close to the construction site but away from traffic areas to minimize disturbance.
- If possible, store Select Fill on a tarp or compacted base to prevent contamination.
B. Preventing Moisture Issues
- Excess moisture can make Select Fill difficult to compact, leading to structural problems.
- Cover stored material with tarps or temporary shelters if rain is expected.
- Avoid storing material in low-lying areas that collect water.
C. Preventing Contamination & Material Loss
- Keep Select Fill separate from other materials to maintain its integrity.
- Use barriers or berms to prevent wind or rain erosion.
- Regularly inspect stored material for debris, organic matter, or unwanted material mixing.
4. How to Maintain Quality Control During Storage
A. Regular Testing of Stockpiled Select Fill
- Moisture Content Testing: Ensure material is not too wet or too dry for proper compaction.
- Particle Size Analysis: Periodic sieve testing confirms material consistency.
- Compaction Testing: Randomly check compacted material to ensure it meets density requirements.
B. Using Select Fill in the Right Order
- Follow the “first in, first out” method—use older material first to avoid excessive moisture absorption.
- Rework material before use—turn and aerate stored fill to maintain uniform consistency.
Conclusion
Efficient delivery and storage of Select Fill is essential for successful construction projects in Dallas-Fort Worth. By working with trusted Borrow Pit suppliers, following proper unloading techniques, and storing material correctly, contractors can ensure high-quality, cost-effective Select Fill usage.
For DFW’s best Select Fill and Borrow Pit options, visit Borrow-Pit.com and connect with reliable local suppliers today!